Saudi Oger integrated design and construction
teams are capable of procuring and delivering fast track design
and build projects, in-house engineering expertise, analyzing the
project demands and finding the optimum solution.
Investment in technology
Building Information
Modeling, using CADD 3D modeling to help the design and
construction process.
Saudi Oger is working with Navis
works 4D modeling that provides the solution that enables projects
designer and building professionals to unite their contributions
into a single, synchronized building information model.
Such software enable a real-time, whole –project view for
effective 3D coordination, 4D planning, photorealistic
visualization, dynamic simulation and analysis.
Value engineering
Value engineering at Saudi Oger
is aimed at “providing the same product quality for less cost and
time�, based on the north American job plan whereby an independent
multi-disciplinary team will review the design/construction
documents at each design stage and make an assessment of the
design/construction solutions proposed and see if the same
objectives can be made more economically without compromising on
quality.
Project management teams
WBS (Work Breakdown Structure) concepts where each item
is tracked and coded and issued with cost item.
Budgets are established by testing market prices.
Communication
Flow of information shall follow and
agreed communication protocol and document control systems. This
protocol will define the electronic media, authorization and
coding of all data each way.
Planning
- Schedule primavera enterprise: software 6.2
(or latest version)
- Recovery schedule: to recover any delays or
slippage to the schedule.
Design management
- Design management: will be handled by a
dedicated project management team
- Design schedule: are as realistic as
possible without undue rush. Monitoring will be via establishing
milestones according to manufacturers and site requirements.
- Design changes: will be tracked by the
contract administrator and a logging system with Coded changes
will be recorded and agreed with the client and the rest of the
design team. This will be done electronically using document
control systems
Sustainability
Sustainable techniques and LEED requirements, will be
handled from day one and starting at the design process.
Preconstruction services
Preconstruction services include:
- Understanding the project objectives
- Making the right decisions
- Propose savings where applicable
- Conduct value engineering at all design
stages
- Discuss the type of contract
- Conduction preliminary Value engineering
- Conduction preliminary Logistic plan.
Design and build capabilities
Performance based specification setting targeted quality standards
will be used with sufficient design drawing to establish:
- The design intent .
- Quality standard required .
- Performance and functions of the desired
building/system.
Engineering base
- Qualified multi-disciplinary teams and
experts in project management, design, procurement, planning,
construction, operation and management
- Over 1800 professionals across all
disciplines
- Present in all continents with a network of
specialists and experts
- Partners in the construction industry that
cover almost all trades
- In house innovation and research center
- Logistical of staff
- Track record of good quality work
- Long list of supply chain
- Factories and businesses that support our
industry
- Follow up with client after project
delivery
- Good reputation for certainty of delivery
and quality work.