Construction & Engineering

"Coming together is a Beginning, keeping together is Progress, working together is Success."
Saudi Oger Construction Division has the resources, the financial capabilities to undertake a broad spectrum of mega construction projects based on a design and build on LSTK (Lump Sum Turnkey) basis

Saudi Oger integrated design and construction teams are capable of procuring and delivering fast track design and build projects, in-house engineering expertise, analyzing the project demands and finding the optimum solution.

Investment in technology

Building Information Modeling, using CADD 3D modeling to help the design and construction process.

Saudi Oger is working with Navis works 4D modeling that provides the solution that enables projects designer and building professionals to unite their contributions into a single, synchronized building information model.

Such software enable a real-time, whole project view for effective 3D coordination, 4D planning, photo realistic visualization, dynamic simulation and analysis.

Value engineering

Value engineering at Saudi Oger is aimed at 'providing the same product quality for less cost and time', based on the north American job plan whereby an independent multidisciplinary team will review the design/construction documents at each design stage and make an assessment of the design/construction solutions proposed and see if the same objectives can be made more economically without compromising on quality.

Project management teams

WBS (Work Breakdown Structure) concepts where each item is tracked coded and issued.

Budgets are established by testing market prices.

Communication

Flow of information shall follow and agreed communication protocol and document control systems. This protocol will define the electronic media, authorization and coding of all data each way.

Planning

  • Schedule primavera enterprise: software 6.2 (or latest version)
  • Recovery schedule: to recover any delays or slippage to the schedule.

Design management

  • Design management: will be handled by a dedicated project management team
  • Design schedule: are as realistic as possible without undue rush. Monitoring will be via establishing milestones according to manufacturers and site requirements.
  • Design changes: will be tracked by the contract administrator and a logging system with Coded changes will be recorded and agreed with the client and the rest of the design team. This will be done electronically using document control systems

Sustainability

Sustainable techniques and LEED requirements, will be handled from day one and starting at the design process.

Preconstruction services

Preconstruction services include:

  • Understanding the project objectives
  • Making the right decisions
  • Propose savings where applicable
  • Conduct value engineering at all design stages
  • Discuss the type of contract
  • Conduction preliminary Value engineering
  • Conduction preliminary Logistic plan.

Design and build capabilities

Performance based specification setting targeted quality standards will be used with sufficient design drawing to establish:

  • The design intent.
  • Quality standard required.
  • Performance and functions of the desired building/system.

Engineering base

  • Qualified multi-disciplinary teams and experts in project management, design, procurement, planning, construction, operation and management
  • Over 1800 professionals across all disciplines
  • Present in all continents with a network of specialists and experts
  • Partners in the construction industry that cover almost all trades
  • In house innovation and research center
  • Logistical of staff
  • Track record of good quality work
  • Long list of supply chain
  • Factories and businesses that support our industry
  • Follow up with client after project delivery
  • Good reputation for certainty of delivery and quality work.

Ministerial utilities

  • Royal Diwan Offices (Riyadh & Jeddah)
  • Medina Diwan
  • Ministry of Education HQ - Riyadh

Luxurious hotels and conference centers

  • Massarah Hotel (Taif)
  • Al Hada Sheraton Hotel (Taif)
  • Guest Palace Hotel (Taif)
  • Medina Sheraton Hotel (Medina)
  • Conference Center in Abha
  • Airport Hotel (Riyadh)
  • Conference Palace in Riyadh
  • Conference Palace in Taif
  • Conference Center & Meridien Hotel in Dakar
  • Le Meridien Towers, Makkah.
  • King Abdul Aziz International Conference Center (Riyadh)
  • King Abdullah International Conference Center & Hotel (Jeddah)
  • The Ritz Carlton (Riyadh)

Military realization

  • King Abdullah Military City in Al-Ihsa.
  • Armed Forces Command Staff Colleges, Salboukh.
  • Prince Sultan Air Base, Al Bayadh, Al-Kharj.
  • Military facilities in Tabuk Armored Institute.

Medical facilities

  • Al Baha hospital (Taif)
  • Eyes Hospital (Riyadh)
  • King Faisal Hospital (Riyadh)
  • King Abdullah University Hospital at PNU
  • The Imperial College London Diabetes Centre
  • Specialist Hospital in Jeddah
  • 150 Neighborhood Clinics different locations within KSA for the Ministry of Health

Schools & Universities

  • Riyadh Schools
  • King Abdullah University of Science and Technology
  • Princess Noura BInt Abdulrahman University (Riyadh)
  • Al Ain University (Abu Dhabi)
  • Saudi Oger Training Institute

Public facilities / Transportation / Infrastructure

  • Holy Quran printing facilities (Medina)
  • Khazzan Street towers (Riyadh)
  • Rawda Library (Riyadh)
  • King Abdulaziz Historical Center, (Riyadh)
  • Pilgrims Accommodations Projects, ( Mina)
  • Al Riyadh Main Courts Complex, (Riyadh)
  • King Khaled International Airport Fence and Monument, (Riyadh)
  • Development of King Abdullah Road
  • King Abdullah Financial District Driverless Monorail
  • King Abdullah Flyover
  • King Abdullah Project for the development of security headquarters
  • Haramain High Speed Railway Station - Jeddah
  • King Abdulaziz Center for World Culture Dhahran